Client: Notaro Care Homes
Main Contractor: Midas Construction
Architect: Boon Brown Architects 
Mechanical Contractor: Keyplan Engineering Ltd
Electrical Contractor: Phaze Electrical Ltd
Location: Bridgwater  
This project comprised a new purpose built 88 bed care home consisting of a 66 bedroom dementia nursing home and 12 assisted living units.
The care home is split across 2 and 3 storey building with secure landscaped gardens designed specifically for residents with dementia.
The building also provide numerous supports areas including, communal dining areas, hairdresser, resident lounges, activity rooms and cafe area
MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties
Disciplines:
- Sanitary Ware and Above Ground Drainage 
- Hot and Cold Water Services 
- Mechanical Ventilation Systems 
- Kitchen Services and Ventilation 
- Laundry Services and Ventilation 
- Restaurant Ventilation and Air Conditioning 
- Gas Fired LTHW Heating 
- Gas Supplies 
- DX Cooling Systems 
- Fire Sprinkler System 
- BMS Control Systems 
- Lighting and Small Power 
- Security Systems and CCTV 
- Data 
- Lightning Protection 
- Nurse Call Systems 
- Fire Detection and Alarms 
- Door Entry Controls 
 
           
        
      
     
                 
                 
                 
                 
                 
                 
                 
                