Client: Wapping Wharf Alpha LLP
Main Contractor: Sisk Construction
Architect: Alec French Architects
Mechanical Contractor: Gasworld Ltd
Electrical Contractor: Fuseland Electrical Ltd
Location: Bristol
Located on the south side of Bristol’s historic harbour on previously derelict land behind the new M Shed, the entire area will be transformed into a lively community of up to 625 new homes, individual shops, offices, cafes and restaurants.
This project is phase 1 and comprised the design and construction of two Blocks, (Block A and Block C) to provide 194 residential units, ground floor retail, a single level basement to both blocks and associated Public Realm works with infrastructure
MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties.
Disciplines:
Sanitary Ware
Above Ground Foul and Rainwater Drainage
Hot and Cold Water Services
Mechanical Ventilation Systems
Car Park Ventilation System
Community LTHW Heating Systems
Combined Heat and Power Plant
DX Cooling Systems
BMS Control Systems
Lighting and Small Power
Security Systems and CCTV
Data
Fire Detection and Alarms
Door Access Controls
Lightning Protection