Client: Wapping Wharf Alpha LLP
Main Contractor: Sisk Construction
Architect: Alec French Architects
Mechanical Contractor: Gasworld Ltd
Electrical Contractor: Fuseland Electrical Ltd
Location: Bristol
Located on the south side of Bristol’s historic harbour on previously derelict land behind the new M Shed, the entire area will be transformed into a lively community of up to 625 new homes, individual shops, offices, cafes and restaurants.
This project is phase 1 and comprised the design and construction of two Blocks, (Block A and Block C) to provide 194 residential units, ground floor retail, a single level basement to both blocks and associated Public Realm works with infrastructure
MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties.
Disciplines:
- Sanitary Ware 
- Above Ground Foul and Rainwater Drainage 
- Hot and Cold Water Services 
- Mechanical Ventilation Systems 
- Car Park Ventilation System 
- Community LTHW Heating Systems 
- Combined Heat and Power Plant 
- DX Cooling Systems 
- BMS Control Systems 
- Lighting and Small Power 
- Security Systems and CCTV 
- Data 
- Fire Detection and Alarms 
- Door Access Controls 
- Lightning Protection 
 
           
        
      
     
                 
                 
                 
                 
                 
                 
                 
                